No. 9 · 2-8-2 Mikado · Lima 1924 · BV&N Archive
Equipment record · BV&N Archive · Ref. BVN-EQUIP-009 No. 9 · 2-8-2 Mikado · Lima Locomotive Works, 1924
Location known · Not disclosed
No. 9 · 2-8-2 Mikado · BV&N roster 1924 to 1968

Number
Nine.
Still here.

Lima Locomotive Works, Ohio, 1924. 44 years on the Bracken Valley line. The last steam locomotive on the BV&N roster. Sold in 1968 to a private buyer in Hartshorn. Her location is known to this archive. It is not shared on request.

2-8-2Wheel arrangement
1924Built
1968Departed roster
MP 47Last known
MP 47
Class2-8-2 Mikado
BuilderLima Locomotive Works, Ohio
In service1924 to 1968
Tractive effortApprox. 48,000 lbf
DispositionPrivate sale, Hartshorn, 1968. Location not disclosed.

Equipment history · BVN-EQUIP-009

44 years on the valley line.


No. 9 arrived on the BV&N roster in 1924 as a Lima Locomotive Works 2-8-2 Mikado type. She was among the last steam locomotives ordered for mountain freight service west of the main line. She had a temperature anomaly before noon that no overhaul corrected, and a documented reluctance in rain that the maintenance records describe in purely technical language. The meaning was plain.

The conductor's logbooks from 1955 to 1968 contain multiple references to her being difficult. The conductor of record at the time eventually requested a transfer to a different run. The request was granted.

She ran the 08:14 southbound out of Hartshorn regularly through her working years. By the time the timetable was suspended she had made that crossing more times than the freight clerk had recorded, which was a great many. She ran hot before noon and sulked when it rained. This is in the maintenance records.

1924
Delivered from Lima Locomotive Works, Ohio. Assigned to the BV&N Hartshorn freight run.
1938
Boiler inspection. Note in file: "Runs 6 to 8 degrees above rated operating temperature before noon. Has done so since 1926. Cause undetermined." No corrective action taken.
1952
Last major overhaul at the Hartshorn shops. New fire tubes, rebored cylinders. She returned to service in 17 days and made the grade at Morrow's Gap faster than the rated specification.
1962
Stalled on the Milepost 44 trestle for 11 minutes on the 08:14 southbound run, July, rain, full load of Fenwick stone. The bents held. She completed the crossing under her own power.
1968
Sold to a private buyer in Hartshorn. November 12. B. Merritt noted the sale in the freight ledger. He noted that she would be missed, though he would not say so to her face.
B. Merritt · freight clerk · July 14, 1962 No. 9 stalled on the MP 44 span for 11 minutes. Rain. Full stone load. I was in the cab. She started again without assistance. (I have not recorded my opinions at the time. They were not relevant to the run. She is aware of this.) Freight ledger note, July 14, 1962. No further incident on that run.
B. Merritt · freight clerk · November 12, 1968 No. 9 departed the roster today. Sold to a private buyer, Hartshorn. She ran hot before noon and sulked in rain. This is noted for the record. (She will be missed, though I would not say so to her face. I am aware that I have now said so in a ledger, which is arguably the same thing. I leave this without correction.) Freight ledger note, November 12, 1968. Last entry concerning No. 9 as BV&N property.
Maintenance log entry · P. Calloway · 1962 She knows who we are. She has always known. This is not a concern. Maintenance log, 1962. Author: P. Calloway, shop foreman. No further context given.

Archive instruments · how she worked

A locomotive is not a photograph.


The roster card tells you No. 9 was a 2-8-2 Mikado, built by Lima in 1924, and that is true and it is nothing. A locomotive is a thing that did work, under pressure, in weather, with a crew reading her by the instruments she carried.

So the archive keeps two of her instruments here, working. Touch them. They answer.

B. Merritt · freight clerk · undated People ask what she was like to run. I tell them to read the glass and watch the gear, because that is what I did, and she never told me anything she did not tell those two. (I have been asked this question more times than I expected. I expected zero.) Freight ledger margin, undated.

Instrument 01The water glass, and what it would not let you ignore.

Everything that could go wrong on a steam locomotive went wrong slowly, in the boiler, where you could not see it. The crew read all of it through one tall glass tube and one brass gauge. Feed the fire, put a load on the drawbar, and watch what she does with it. Drag the loupe across her iron to see inside. She runs a few pounds hot before noon, as she has since 1926.

01
Boiler inspection · the water glass
The Glass
Boiler inspection · the water glassRated 200 psi

The gauge reads the pressure. The iron hides the rest. Feed the fire and load her up: the firebox roars, the water laps in the glass, the safety valve lets go. Drag the loupe across her to x-ray what is moving inside.

--
LBS / SQ IN 200
Fire rate
Load on the drawbar
0 t120 t350 t
Time of day
Normal fire, a light load, the morning. She sits at the rated mark and lets you look.

Push her into the red and hold her there, and the fusible plug above the fire goes soft on purpose: a lead plug that melts and drops the fire before the crown sheet can fail. Tap the gauge while she is over the mark and the glass crazes under your finger.

Maintenance log entry · P. Calloway · 1959 Gauge glass replaced today. The old one was sound. I replaced it because she had earned a clean one. Maintenance log, 1959. Author: P. Calloway, shop foreman.

Instrument 02The valve gear, where the throttle became motion.

Pressure in the boiler does nothing on its own. The mechanism that times the steam into the cylinders is the valve gear. Open the throttle and the linkage runs. Shorten the cutoff and watch the valve travel close down: less steam per stroke, less coal, the same pressure does more work. This is the whole art of running her economically, in one diagram, moving.

02
Valve gear · left side
Walschaerts Valve Gear
Walschaerts valve gear · left sideCutoff and throttle

The gear that timed her steam. Open the throttle to run the motion. Shorten the cutoff and watch the valve travel close down: less steam per stroke, less coal, less speed.

DRIVER EXP. LINK CYLINDER VALVE
Throttle
Cutoff (steam admitted per stroke)
15% short50%75% long
Power62indicated, relative
Coal burn3.1tons per hour
Working throttle at 50 percent cutoff. A balanced hand. She will run all day like this.

A green crew ran in full gear all day and wondered why the tender emptied by noon. A good one notched her back the moment she had her train rolling and let the expansion do the work.

B. Merritt · freight clerk · undated Her location is known. I have not written it here. (I kept 38 years of freight records without once writing down a thing that was not mine to write. I see no reason to start now, retirement or not.) Found in B. Merritt's personal effects, transferred to the archive after his death. Undated.

Two instruments, then, kept working in an archive, for a locomotive that left the roster in 1968 and turns coffee now instead of wheels. She runs hot before noon and sulks when it rains, and she knows exactly where she is.

Record referenceBVN-EQUIP-009
Roster entry1924 to 1968
Regular service08:14 southbound from Hartshorn, 1924 to 1968
Current statusLocation known. Not disclosed on request.